Antelope Court

Project Description

Antelope Court is the second phase of a Human Resources Development Council District 4 low income housing on the South end of 5th Ave in Havre, Montana. This was a much-needed project in Havre, to build 24 units that fully meet the ADA Requirements. This was our 2nd project with HRDC in 4 years and the first with Fisher Construction out of Billings. This job went through many changes in an effort to get it built on budget. The biggest challenge was how much building was going on in a small space. There was no room for building materials let alone spoil piles, bedding materials and other items required to build out the project. Things were always being moved, added or deleted and circumstances changed on a daily basis. We handled all of the mass excavation which included over 12,000 CY of embankment on site. The water was looped threw an adjacent site. The water line was bored under the road to Buffalo Court, where the road could not be blocked due to the line’s depth and open cut was not an option for this install. The Civil Engineer did not have a lot of experience with boring 8” HDPE and it was good to share our knowledge to make this successfull. Lakeside installed the sanitary sewer, storm sewer and water systems, as well as the general excavation for all the buildings on site. Lakeside again proving to excel on a small site with a tight timeline.

Photo Gallery